SS44 Remote - More wiring work - November 2010
Paul G4CCZ wiring up the receiver cabinet in November 2010.
SS44 Remote - Original work - April 2010
It's 98 ft from one antenna to the next. Paul G4CCZ does many cable connections. Spring has arrived in North Devon (SS44)
A table full of bits for the DX-Engineering four-square antenna. Fieldwork : four posts for the antennas and a fifth post at the centre
Feeding control cable and coax cable through wall into shack. DX Engineering outside hardware. Will it withstand the Devon rains?
Four 8ft rod antennas are used in 4SQ array. Centre post supports delay lines and switch. Guard around each of the four antennas.